Site Work Begins!

By Jessica Schultz

After many months of intense design, planning and review, work has begun at our new site! What has happened in May so far? The silt fencing has been installed around our site to protect wetlands and limit run off. The limit of work and center line of our driveway have been surveyed and staked. Site clearing has begun and is nearly finished. It’s looking a lot different out there!

We have worked with Reelife Documentary Productions to installed two time-lapse cameras on site the capture the changes as they happen. Stay tuned as we work to bring you closer to how we’re restoring the site while building a new home and teaching facility for our educational goals.

Check out this slide show of latest site work:

Comments are closed.

Click here to return to full list of blog entries. Or chose a specific Blog category below.

Blog categories

Recent posts

Blog categories

Archives

Translate »
Hitchcock Center for the Environment